国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Baiyinhua No. 3 coal mine dry coal preparation plant, with a design capacity of 6.0mt/a, is built in an open pit, and it takes only 70 days from construction to operation. It is mainly used for the full size separation of residual coal and low calorific value coal in the pit. The calorific value of raw coal is 2958kcal / kg, and the calorific value of cleaned coal after separation is increased to 3524kcal / kg. Dry separation not only improves the calorific value of coal, but also reduces the stock of residual coal and reduces the risk of spontaneous combustion, which has brought huge economic and social benefits to the mine. It is also the largest underground dry coal preparation plant in the world.


ITEM

yield Wt%

ASH Ad% ??

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg ??

RAW COAL

100

31.55

2937

CLEAN COAL

80.40

18.99

3524

REJECT

19.60

83.08

531


INNER MONGOLIA BAIYINHUA MENGDONG OPEN PIT COAL INDUSTRY CO., LTD

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

偃师市| 老河口市| 林周县| 双江| 库车县| 台州市| 鄂伦春自治旗| 上犹县| 嵩明县| 昌都县| 福海县| 姜堰市| 天台县| 榆社县| 岳阳市| 时尚| 仙桃市| 鲁山县| 松滋市| 长沙县| 阿鲁科尔沁旗| 南宁市| 钟祥市| 鄂州市| 沿河| 仲巴县| 子长县| 白水县| 富阳市| 海安县| 汶上县| 策勒县| 钦州市| 邢台县| 北川| 凤台县| 南阳市| 淄博市| 岚皋县| 延庆县| 雷州市|