国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Baiyinhua No. 3 coal mine dry coal preparation plant, with a design capacity of 6.0mt/a, is built in an open pit, and it takes only 70 days from construction to operation. It is mainly used for the full size separation of residual coal and low calorific value coal in the pit. The calorific value of raw coal is 2958kcal / kg, and the calorific value of cleaned coal after separation is increased to 3524kcal / kg. Dry separation not only improves the calorific value of coal, but also reduces the stock of residual coal and reduces the risk of spontaneous combustion, which has brought huge economic and social benefits to the mine. It is also the largest underground dry coal preparation plant in the world.


ITEM

yield Wt%

ASH Ad% ??

Qnet,ar,Kcal/kg ? NET CALORIFIC VALUE Qnet,ar,Kcal/kg ??

RAW COAL

100

31.55

2937

CLEAN COAL

80.40

18.99

3524

REJECT

19.60

83.08

531


INNER MONGOLIA BAIYINHUA MENGDONG OPEN PIT COAL INDUSTRY CO., LTD

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

高碑店市| 遂溪县| 江川县| 青海省| 新郑市| 昌江| 新巴尔虎右旗| 景德镇市| 获嘉县| 蒲城县| 屯昌县| 炎陵县| 简阳市| 重庆市| 郴州市| 崇阳县| 夏津县| 海门市| 白沙| 怀远县| 大名县| 淳化县| 昌乐县| 丁青县| 佳木斯市| 龙胜| 丰台区| 天门市| 大荔县| 清苑县| 泗洪县| 额济纳旗| 鄄城县| 黄山市| 上思县| 富宁县| 广灵县| 新晃| 洛扎县| 紫金县| 奉节县|