国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Liyuanhe coal mine of Xuangang coal power company built a 2.4mt/a dry process coal preparation plant in 2014. In order to further improve the efficiency of the coal preparation plant and reduce costs, the mine entrusted Shenzhou group to contract and operate in October 2016, so as to realize the high-quality and efficient operation of the coal preparation plant. Since the plant has been operated by Shenzhou, the coal preparation output has increased, the energy consumption has been significantly reduced, the separation accuracy has been greatly improved, and the calorific value of cleaned coal has increased by 1200kcal / kg, which has won the recognition of customers with professional services and achieved mutual benefit and win-win results.


ITEM

yield Wt%

ASH Ad%

Qnet,ar,Kcal/kg   NET CALORIFIC VALUE Qnet,ar,Kcal/kg

RAW COAL

100

49.29

3525

CLEAN COAL

72.20

37.19

4574

REJECT

27.80

80.73

801

XUANGANG COAL POWER COMPANY OF DATONG COAL MINE GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

仁怀市| 南岸区| 九寨沟县| 台州市| 桃园市| 南宁市| 姚安县| 牡丹江市| 武夷山市| 乐东| 台江县| 渭南市| 闸北区| 罗田县| 高雄市| 汝城县| 称多县| 馆陶县| 贵州省| 和顺县| 辽宁省| 房产| 东平县| 繁昌县| 道真| 酒泉市| 岳池县| 本溪| 盱眙县| 阳朔县| 道孚县| 托克逊县| 高碑店市| 迁西县| 铜鼓县| 湖北省| 全南县| 奎屯市| 海城市| 庆城县| 西充县|