国内精品视频一区二区三区八戒,亚洲一区色图,91专区,yellow网站在线观看

SHENZHOU MANUFACTURING GROUP

+86-315-2961888/+86-315-2965555

Linhuan Coal Preparation Plant of Huaibei Mining Group has an annual capacity of 16.0mt/a. It adopts the full heavy medium separation process and has six branches, five of which adopt Shenzhou dry coal preparation technology for pre discharging reject, which has achieved the effect of killing three birds with one stone. First, it reduces the processing burden of heavy medium cyclone; Second, it reduces the load of flotation and slime concentration and pressure filtration system; Third, the power consumption per ton of coal is 2.6kw · h, and the proportion of washing per ton of coal saves 4.29kw · H. The successful application of the project has demonstration significance and provides reference experience for the process design of similar coking coal preparation plants.


ITEM

yield Wt%

ASH Ad%

RAW COAL

100

76.79

CLEAN COAL

34.82

55.58

REJECT

65.18

88.12

LIN HUAN COAL PREPARATION PLANT OF HUAIBEI MINING GROUP

TIME: 2022-03-07
FOLLOW WITH OUR WECHAT,?
TO KNOW MORE ABOUT SHENZHOU GROUP.

PRICE? YIELD? MODEL? AFTER-SALE SERVICE? PEASE LEAVE A MESSAGE ONLINE, WE WILL REPLY TO YOU AS SOON AS POSSIBLE.

ONLINE MESSAGE

遂昌县| 专栏| 杂多县| 精河县| 五河县| 沙雅县| 宜川县| 门源| 仁怀市| 三明市| 乌鲁木齐市| 永胜县| 万载县| 四子王旗| 鹤庆县| 呼玛县| 万山特区| 太湖县| 罗定市| 微博| 凤阳县| 墨竹工卡县| 乐至县| 嫩江县| 周宁县| 宜宾市| 花莲县| 荣成市| 潮安县| 富裕县| 启东市| 云和县| 泰安市| 武夷山市| 公安县| 漯河市| 洛阳市| 丽水市| 五峰| 固原市| 中方县|